Illustration of a chip package with a routed die, floorplan blocks and glowing metal layers

VLSI physical design & signoff services

Your RTL in. A signed-off GDSII out.

PratMOS is a VLSI physical design and signoff team, founded in October 2026. We take the stretch between finished RTL and a layout the foundry accepts: timing closure, power integrity and physical verification on 2nm/3nm GAAFET and FinFET nodes.

Process nodes
2nm / 3nm GAAFET, FinFET
Timing closure
MCMM and POCV STA
Power integrity
Static and dynamic IR, EM
Verification
SystemVerilog / UVM, DRC / LVS
EDA tool exposure
Fusion CompilerIC Compiler IIInnovusAprisaPrimeTimeTempusStarRCQuantusRedHawk-SCVoltusPrimePowerCalibreIC ValidatorPegasusVCSXceliumQuestaVerdiJasperGoldVC FormalDesign CompilerGenusFormalityConformalTestMAXTessentModusUVMSystemVerilogUPF

Look inside a layout

Every signoff question starts in the layers

This is a standard-cell row, the repeating strip that place and route fills with logic. Switch the layers on and off to see how the stack builds up. Our timing, power-integrity and physical-verification checks all read from this same database.

polyTransistor gates. Their pitch and width set speed and leakage.
M1Local routing inside a cell row, plus the VDD and VSS rails where IR drop starts.
M2Vertical routing between rows. Narrow lower metals are where electromigration bites first.
viaConnections between layers. Via resistance matters for both IR drop and EM.
See the six VLSI skills
cell_row_a.gds
VDD rail: IR drop starts here ↘
PratMOS logo mark: a blue faceted P with an orbiting ring
PratMOS Technologies Private Limited wordmark

Who we are

A VLSI team built around signoff

PratMOS Semiconductos Private Limited is a semiconductor design and signoff engineering firm, founded in October 2026. We work on the part of the VLSI flow where timing, power and manufacturing rules all push back at the same time: from finished RTL to a GDSII the foundry can accept.

The name joins Pratam, Sanskrit for first, with MOS, the transistor structure under every chip we touch. It is the bar we set ourselves: to be the team a design lead calls first when timing will not close or the IR report looks wrong.

About PratMOS

RTL to GDSII

Eight steps from finished RTL to stream-out

Each step has an owner, a check and the EDA tools we work in. Nothing moves to the next step until the one before it is clean.

  1. Handoff and synthesis

    Review RTL, SDC and libraries, then synthesize to a gate-level netlist and check equivalence.

    Design Compiler · Fusion Compiler · Genus · Formality · Conformal
  2. DFT insertion

    Scan, compression, memory BIST and JTAG are planned before layout, not squeezed in after it.

    TestMAX DFT · Tessent · Modus
  3. Floorplan and power

    Macro placement, pin assignment, power grid and the IO / ESD ring.

    Fusion Compiler · IC Compiler II · Innovus · Aprisa
  4. Placement and CTS

    Congestion-driven placement, multi-corner clock trees, skew and latency work.

    Fusion Compiler · IC Compiler II · Innovus
  5. Routing and ECO

    Detailed routing, crosstalk avoidance, timing ECOs and hold fixing.

    IC Compiler II · Innovus · PrimeTime · Tempus
  6. Timing signoff

    MCMM STA with POCV, SI and crosstalk analysis, and ECO loops until every corner passes.

    PrimeTime · Tempus · StarRC · Quantus
  7. Power integrity

    Static and dynamic IR drop, EM checks and power-grid fixes on realistic activity.

    RedHawk-SC · Voltus · PrimePower
  8. Physical verification and GDSII

    DRC, LVS, ERC, antenna and DFM checks, then stream-out of the GDSII.

    Calibre · IC Validator · Pegasus

Tool names are listed to show flow exposure. Your PDK and foundry decide which flow applies, and we confirm the fit before we scope the work.

VLSI services

Six skills that cover the signoff stretch

Physical design, timing, power integrity, verification, manufacturability and test. Take all six turnkey, or just the one that is stuck.

Floorplan illustration with SRAM macros, a CPU cluster, standard-cell rows and a power grid

We take your netlist to a finished layout: floorplan, power, placement, clock tree and routing.Click for the full picture

Physical design

RTL to GDSII

Sub-3nm GAAFET and FinFETLow power (UPF / CPF)Hierarchical floorplans
Details and tools +
Timing waveform with a clock, a data signal, a highlighted setup window and a negative slack report

We make sure every path meets timing in every corner and mode, before the chip is made.Click for the full picture

STA and timing signoff

MCMM, POCV, crosstalk

MCMM closurePOCV / AOCV deratesSI and crosstalk fixes
Details and tools +
Heat map of dynamic IR drop across a die with a hot spot and power straps

We check that power reaches every cell and that the wires will not wear out over time.Click for the full picture

EM / IR power integrity

Static and dynamic IR

Vector-based dynamic IRSignal and power EM fixesGrid robustness tuning
Details and tools +
UVM testbench block diagram with sequence, driver, monitor, scoreboard, coverage and a DUT

We write testbenches that hunt for bugs in your RTL long before tapeout.Click for the full picture

Design verification

SystemVerilog and UVM

UVM architectureAssertions (SVA)Gate-level simulation
Details and tools +
Layout with a highlighted spacing violation and a DRC, LVS and antenna check summary

We check the layout against the foundry's rules so it can actually be manufactured.Click for the full picture

Physical verification

DRC, LVS, DFM

DRC / LVS signoffDFM and CMPAntenna and ESD rules
Details and tools +
Scan chain of flip-flops with MBIST, JTAG TAP and ATPG blocks and a fault-coverage bar

We add the hooks that let every manufactured chip be tested for faults.Click for the full picture

DFT and test

Scan, BIST, ATPG

Scan compression and ATPGLogic and memory BISTIEEE 1500 / 1149.1
Details and tools +
Isometric illustration of a gate-all-around nanosheet transistor showing source, drain, gate and stacked nanosheet channels
Gate-all-around nanosheet transistor: the gate wraps every channel, which is why 2nm and 3nm designs behave differently from planar ones.

Advanced nodes

Built for 2nm / 3nm GAAFET and FinFET

At advanced nodes the margins that used to hide problems are gone. Four things push back at once, and our flow is organised around them.

  • Timing: on-chip variation at low voltage eats margin. POCV tuning recovers frequency that blanket derates give away.
  • Power delivery: resistive lower metals and high current density make IR drop and electromigration first-order concerns.
  • Manufacturing rules: dense DRC decks, multi-patterning, density and antenna rules need clean-up before, not after, final routing.
  • Test: bigger designs mean scan compression, memory BIST and ATPG have to be planned early.
See how we work

VLSI services: common questions

Straight answers on physical design, signoff, nodes and tools.

What is VLSI physical design, and what does PratMOS do in it?

Physical design turns a synthesized gate-level netlist into a manufacturable layout: floorplan, power grid, placement, clock tree and routing. PratMOS runs that flow and the signoff checks that follow it, so the result is a GDSII the foundry accepts.

What does signoff mean in a VLSI flow?

Signoff is the last set of checks that prove a design is ready for tapeout: timing across every corner and mode, IR drop and electromigration, and DRC, LVS and antenna rules. Each one is run with foundry-supported tools and rule decks, and each has to pass before stream-out.

Which process nodes do you work on?

Our focus is 2nm and 3nm GAAFET and FinFET designs. We also take 5nm and 7nm FinFET, 12nm and 16nm FinFET, and mature nodes of 28nm and above, where we can often scope a single piece such as signoff-only or DFT-only.

Which EDA tools does your team have exposure to?

Industry-standard flows from Synopsys, Cadence and Siemens EDA, including Fusion Compiler, IC Compiler II, Innovus, PrimeTime, Tempus, RedHawk-SC, Voltus, Calibre, IC Validator, VCS, Xcelium, Questa and Tessent. Tell us what your PDK and foundry require and we will confirm the fit before we scope the work.

Can you take on just one stage, such as signoff or DFT?

Yes. We work either turnkey, from netlist to signed-off GDSII, or on a single stage such as timing signoff, EM / IR, physical verification, DFT or verification.

What do we receive at handover?

The final GDSII or OASIS, netlist, SDC and SPEF, timing, IR / EM and DRC / LVS reports for every corner and mode, a signoff checklist, and the scripts to rerun the flow.

How do I start a project with PratMOS?

Use the contact page to tell us your process node, schedule, where the design stands today and where it hurts. An engineer reads it, not a sales queue.

Got a tapeout coming up?

Tell us the node and the date, and where it hurts.

Contact us